|
||
|
||
|
||
This illustration shows a two-stage ditch design. The Wabash River Conservancy District constructed a two-stage ditch in a roughly 1,600-foot-long stretch of the river last fall. The design mimics the shape of a natural stream and provides stream bank stability against erosion. |
||
|