Frost Advisory issued April 5 at 1:22PM EDT until April 6 at 10:00AM EDT by NWS Wilmington OH (details ...)
* WHAT...For the Frost Advisory, temperatures as low as 34 will result in frost formation. For the Freeze Watch, sub-freezing temperatures as low as 27 possible.
* WHERE...Portions of east central and southeast Indiana and central, south central, southwest, and west central Ohio.
* WHEN...For the Frost Advisory, from 1 AM to 10 AM EDT Monday. For the Freeze Watch, from late Monday night through Tuesday morning.
* IMPACTS...Frost and freeze conditions could kill crops, other sensitive vegetation and possibly damage unprotected outdoor plumbing. Frost could harm sensitive outdoor vegetation. Sensitive outdoor plants may be killed if left uncovered.
Freeze Watch issued April 5 at 1:22PM EDT until April 7 at 10:00AM EDT by NWS Wilmington OH (details ...)
* WHAT...For the Frost Advisory, temperatures as low as 34 will result in frost formation. For the Freeze Watch, sub-freezing temperatures as low as 27 possible.
* WHERE...Portions of east central and southeast Indiana and central, south central, southwest, and west central Ohio.
* WHEN...For the Frost Advisory, from 1 AM to 10 AM EDT Monday. For the Freeze Watch, from late Monday night through Tuesday morning.
* IMPACTS...Frost and freeze conditions could kill crops, other sensitive vegetation and possibly damage unprotected outdoor plumbing. Frost could harm sensitive outdoor vegetation. Sensitive outdoor plants may be killed if left uncovered.
35° 35° frost Mon 53° Mon 53° 27° 27° Tue 44° Tue 44°
Saturday, July 8th, 2006
Find another route
Photo by Mark Pummell/The Daily Standard

A crew from Tumbusch Construction, St. Henry, tears up the old pavement in the 400 block of Touvelle Street on Friday in anticipation of complete reconstruction of the street between Main Street and Fairground Road. The street east of Mackinaw is closed approximately until September. The street west of Mackinaw will then be closed for a couple of months. The city is spending about $1.2 million on the project, which also includes some underground water and sewer work. Most of the project is being paid for through an Ohio Department of Transportation grant.

Additional pictures on this date